Skip to content
DiploTrack
898 of 1028 FROM THIS SPEAKER

Suriname (government) (SUR)

Suriname Press release: STATEMENT

2026-09-17 · data through unknown

EN · statement #51922 ·

Who
Suriname (government) · Suriname
Topic
No topic assigned
Event
No event linked

No claim toward a country was found in this statement.

Positions are machine-coded from the highlighted sentence. How claims are read and which are shown

In February 2026, the Republic of Suriname has issued a Social Bond to finance eligible social expenditures and priority social projects. The Employer now invites sealed bids from eligible bidders for the Design and Build of housing infrastructure and associated works at Reeberg Block 3B . Scope of Works and related services Design Phase: Planning and analysis (legal obligations, survey, topography, soil quality measurements) according to the given allotment layout (housing plots, open spaces and public areas). …
Full original text (EN, 1,336 Characters) ▾

In February 2026, the Republic of Suriname has issued a Social Bond to finance eligible social expenditures and priority social projects. The Employer now invites sealed bids from eligible bidders for the Design and Build of housing infrastructure and associated works at Reeberg Block 3B . Scope of Works and related services Design Phase: Planning and analysis (legal obligations, survey, topography, soil quality measurements) according to the given allotment layout (housing plots, open spaces and public areas). Engineering & civil design (preliminary and final stage). Approvals and permits. Execution Phase: Carrying out preparatory, surveying and measurement works. Executing drainage works, inclusive of excavation and profiling of road-side drains. Constructing access roads/driveways and other crossings by means of culverts and retaining walls. Staking out the housing plots and those for the public facilities and having PIDs (Parcel Identity from the Management Institute GLIS) acquired. Supplying, placing, and compacting asphalt pavement Installing traffic facilities and applying road markings. Executing all related and ancillary works. Maintenance Phase/ Warranty Period: Maintaining the completed works in good condition throughout the construction period and the maintenance period/ warranty period.