Permanent Mission of Lithuania to the United Nations (LTU)
Lithuania UN General Assembly: Civil nuclear power
2026-10-23 · data through unknown
EN · statement #39167 ·
- Who
- Permanent Mission of Lithuania to the United Nations · Lithuania
- Topic
- Civil nuclear power
- Event
- UN action · 29 Sep 2026
Lithuania → Belarus
Strongly negative · Position
Shown in site figures
Belarus did not evaluate density and distribution of Lithuanian population, also did not establish zone called Extended Planning Distance (EPD) with radius of 100 km from NPP as it is suggested in IAEA recommendations.
Lithuania → Belarus
Strongly negative · Position
Shown in site figures
Lithuania therefore reiterates its call on Belarus to suspend the operation of the plant until all outstanding safety concerns have been comprehensively addressed
Lithuania → Belarus
Negative · Position
Shown in site figures
Belarus's plans to expand the plant with an additional reactor and to develop radioactive waste storage infrastructure at the same site raise further concerns
Lithuania → Belarus
Negative · Position
Not shown: below the confidence bar
Around 1/3 of the whole Lithuanian population, situated within EPD, could be affected in the case of beyond designbasis accident
Positions are machine-coded from the highlighted sentence. How claims are read and which are shown
Lithuania remains seriously concerned about unresolved safety issues, including a principal safety issue related to site selection and assessment. Belarus did not evaluate density and distribution of Lithuanian population, also did not establish zone called Extended Planning Distance (EPD) with radius of 100 km from NPP as it is suggested in IAEA recommendations. Around 1/3 of the whole Lithuanian population, situated within EPD, could be affected in the case of beyond designbasis accident and implementation of the emergency response actions, including evacuation, could be very complicated or even impossible. …Full original text (EN, 1,282 Characters) ▾
Lithuania remains seriously concerned about unresolved safety issues, including a principal safety issue related to site selection and assessment. Belarus did not evaluate density and distribution of Lithuanian population, also did not establish zone called Extended Planning Distance (EPD) with radius of 100 km from NPP as it is suggested in IAEA recommendations. Around 1/3 of the whole Lithuanian population, situated within EPD, could be affected in the case of beyond designbasis accident and implementation of the emergency response actions, including evacuation, could be very complicated or even impossible. Belarus's plans to expand the plant with an additional reactor and to develop radioactive waste storage infrastructure at the same site raise further concerns and underscore the importance of comprehensive safety assessments, transparency and meaningful transboundary consultations. Lithuania therefore reiterates its call on Belarus to suspend the operation of the plant until all outstanding safety concerns have been comprehensively addressed and to refrain from further expansion until the applicable nuclear safety and environmental requirements have been fully met. The safety of populations on both sides of the border must remain the overriding priority.