Skip to content
DiploTrack
118 of 143 FROM THIS SPEAKER

Nepal (foreign ministry) (NPL)

Nepal Press release: STATEMENT

2026-09-08 · data through unknown

EN · statement #36339 ·

Three people have been rescued alive from the tunnels in the last five days (2 Nepali nationals from Upper Trishuli 3A tunnel on 04 September 2026 and 1 Chinese national from Upper Trishuli 1 tunnel on 05 September 2026). Around 5,300 people still remain missing, including approximately 600 foreigners from 35 countries. …
Full original text (EN, 1,007 Characters) ▾

Three people have been rescued alive from the tunnels in the last five days (2 Nepali nationals from Upper Trishuli 3A tunnel on 04 September 2026 and 1 Chinese national from Upper Trishuli 1 tunnel on 05 September 2026). Around 5,300 people still remain missing, including approximately 600 foreigners from 35 countries. 1,357 bodies have been recovered from the flood-affected areas . These figures are constantly updated as search and verification continue. Efforts to Restore Connectivity: The authorities are actively working on restoring road, electricity and telecommunication connectivity to the affected areas and on ensuring timely delivery of relief materials to the affected people. Additional supplies and assistance, including those coming from international community, partners and individuals are being mobilised effectively. The Nepali Army, together with a team of engineers, has been working to restore the Galchhi–Trishuli Road by constructing a temporary bridge over the Tadi River.

Tone toward targets (3)

How this statement speaks of each target it names, read by a model from the evidence sentence.

  • Neutral toward unnamed target“Around 5,300 people still remain missing, including approximately 600 foreigners from 35 countries.”
  • Positive toward unnamed target“Efforts to Restore Connectivity: The authorities are actively working on restoring road, electricity and telecommunication connectivity to the affected areas and on ensuring timely delivery of relief materials to the affected people.”
  • Positive toward Nepali Army“The Nepali Army, together with a team of engineers, has been working to restore the Galchhi–Trishuli Road by constructing a temporary bridge over the Tadi River.”