The Zaporizhzhia Nuclear Power Plant in Ukraine (ZNPP) has experienced 27 complete loss of off-site power events since 2022, 16 this year alone. We recall that the 330kV Ferosplavna line, which is currently the only connection between ZNPP and the electrical grid, has been disconnected on multiple occasions since last spring. …Full original text (EN, 1,001 Characters) ▾
The Zaporizhzhia Nuclear Power Plant in Ukraine (ZNPP) has experienced 27 complete loss of off-site power events since 2022, 16 this year alone. We recall that the 330kV Ferosplavna line, which is currently the only connection between ZNPP and the electrical grid, has been disconnected on multiple occasions since last spring. Repairs to the 750 kV Dniprovska main power line and its substation need to be completed with urgency to ensure a more reliable connection of ZNPP to the electrical grid, which is essential for its safe operation. As the diesel fuel reserves on site remain low, priority should now be given to re-supplying the fuel needed. The situation at ZNPP remains precarious and is getting worse, as military activity continues to degrade the nuclear safety and security at ZNPP. We welcome the eighth local ceasefire negotiated by DG Grossi and we praise the Agency’s instrumental efforts to mediate a ninth local ceasefire needed for repairs of the Dniprovska line and substation.
Tone toward targets (1)
How this statement speaks of each target it names, read by a model from the evidence sentence.
- Neutral toward Ukraine“Repairs to the 750 kV Dniprovska main power line and its substation need to be completed with urgency to ensure a more reliable connection of ZNPP to the electrical grid, which is essential for its safe operation.”