Skip to content
DiploTrack
120 of 173 FROM THIS SPEAKER

Government of Gabon (GAB)

Gabon Press release: STATEMENT

2026-09-26 · data through 24 Nov 2026, 09:50 UTC

FR · statement #16906 ·

Le ministre des Travaux publics et de la Construction, Edgard MOUKOUMBI, accompagné du ministre de la Mer, de la Pêche et de l’Économie bleue, Aimé Martial MASSAMBA, de l’ambassadeur de France au Gabon, Fabrice MAURIÈS, ainsi que des représentants de la Société Autoroutière du Gabon (SAG), du groupe China Road and Bridge Corporation (CRBC), de la mission de contrôle STUDY et des équipes techniques du ministère, s’est rendu ce samedi 26 septembre 2026 sur le tronçon PK24-PK40 de la Nationale 1. …
Full original text (FR, 1,496 Characters) ▾

Le ministre des Travaux publics et de la Construction, Edgard MOUKOUMBI, accompagné du ministre de la Mer, de la Pêche et de l’Économie bleue, Aimé Martial MASSAMBA, de l’ambassadeur de France au Gabon, Fabrice MAURIÈS, ainsi que des représentants de la Société Autoroutière du Gabon (SAG), du groupe China Road and Bridge Corporation (CRBC), de la mission de contrôle STUDY et des équipes techniques du ministère, s’est rendu ce samedi 26 septembre 2026 sur le tronçon PK24-PK40 de la Nationale 1. Cette descente de terrain avait pour objectif de constater la reprise effective des travaux d’élargissement de cet axe stratégique, après plusieurs mois d’interruption. Elle marque ainsi une nouvelle étape dans la relance de ce chantier majeur pour les infrastructures routières du pays. Sur place, le ministre a pu constater le déploiement des équipes et des moyens mobilisés par le nouveau constructeur, tout en faisant le point sur les prochaines étapes du chantier. Il a également rappelé aux différentes parties prenantes la nécessité de maintenir un rythme soutenu dans l’exécution des travaux, conformément aux engagements pris. Cette reprise intervient dans un nouveau cadre contractuel, à la suite de la résiliation du contrat avec AFCONS Infrastructure. Le groupe chinois CRBC est désormais chargé de poursuivre les travaux d’élargissement du tronçon PK24-PK40, avec pour objectif de permettre la relance durable du chantier et son exécution dans les meilleures conditions techniques.

Machine translation (english, opus-mt:fr-en), not checked by a person ▾

The Minister of Public Works and Construction, Edgard MOUKOUMBI, accompanied by the Minister for the Sea, Fisheries and Blue Economy, Aimé Martial MASSAMBA, the Ambassador of France to Gabon, Fabrice MAURIÈS, as well as representatives of the Gabon Railway Company (SAG), the China Road and Bridge Corporation Group (CRBC), of the STUDY control mission and the technical teams of the Ministry, visited this Saturday 26 September 2026 on the section PK24-PK40 of National 1. The aim of the descent was to see the actual resumption of work on the expansion of this strategic axis, after several months of interruption. It thus marks a new stage in the revival of this major project for the country's road infrastructure. On the spot, the Minister was able to observe the deployment of the teams and means mobilized by the new manufacturer, while taking stock of the next steps of the project. He also reminded the various stakeholders of the need to maintain a sustained pace in the implementation of the work, in line with the commitments made. This takes place in a new contractual framework, following the termination of the contract with AFCONS Infrastructure. The Chinese CRBC Group is now responsible for further work on the extension of the PK24-PK40 section, with a view to ensuring that the construction site will be relaunched and carried out under the best technical conditions.

Tone toward targets (2)

How this statement speaks of each target it names, read by a model from the evidence sentence.

  • Positive toward China“Le groupe chinois CRBC est désormais chargé de poursuivre les travaux d’élargissement du tronçon PK24-PK40, avec pour objectif de permettre la relance durable du chantier et son exécution dans les meilleures conditions techniques.”
  • Neutral toward France“Le ministre des Travaux publics et de la Construction, Edgard MOUKOUMBI, accompagné du ministre de la Mer, de la Pêche et de l’Économie bleue, Aimé Martial MASSAMBA, de l’ambassadeur de France au Gabon, Fabrice MAURIÈS, ainsi que des représentants de la Société Autoroutière du Gabon (SAG), du groupe China Road and Bridge Corporation (CRBC), de la mission de contrôle STUDY et des équipes techniques du ministère, s’est rendu ce samedi 26 septembre 2026 sur le tronçon PK24-PK40 de la Nationale 1.”