Skip to content
DiploTrack
2 of 23 FROM THIS SPEAKER

Ministry of Foreign Affairs, Uganda (UGA)

Uganda Press release: Transport and infrastructure connectivity

2026-11-19 · data through 25 Nov 2026, 12:50 UTC

EN · statement #12535 ·

Who
Ministry of Foreign Affairs, Uganda · Uganda
Topic
Transport and infrastructure connectivity
Event
No event linked

No claim toward a country was found in this statement.

Positions are machine-coded from the highlighted sentence. How claims are read and which are shown

H.E. President Samia Suluhu Hassan of the United Republic of Tanzania is in Uganda for a 2-day State Visit at the invitation of her counterpart, H.E. President Yoweri Kaguta Museveni. The two leaders have agreed to accelerate key regional development projects, including the East African Crude Oil Pipeline (EACOP), the Standard Gauge Railway (SGR) and cross-border energy connectivity initiatives. …
Full original text (EN, 1,395 Characters) ▾

H.E. President Samia Suluhu Hassan of the United Republic of Tanzania is in Uganda for a 2-day State Visit at the invitation of her counterpart, H.E. President Yoweri Kaguta Museveni. The two leaders have agreed to accelerate key regional development projects, including the East African Crude Oil Pipeline (EACOP), the Standard Gauge Railway (SGR) and cross-border energy connectivity initiatives. During bilateral talks at State House, Entebbe, on November 18, 2026, the two leaders reaffirmed their commitment to strengthening economic cooperation, regional trade and East African integration. Key highlights of the discussions include: 🔹 EACOP: Expedite completion of the pipeline, currently 93.9% complete. 🔹 Regional Energy Hub: Fast-track plans to develop Tanga into a regional petroleum hub for refining, storage, distribution and industrial production. 🔹 Railway Connectivity: Accelerate the Isaka–Lusahunga–Murongo/Kikagati–Mpondwe Standard Gauge Railway project. 🔹 Lake Victoria Transport: Advance plans for MV Mwanza to operate between Mwanza and Port Bell, carrying up to 400 metric tonnes of cargo and 1,200 passengers. 🔹 Electricity Connectivity: Fast-track the 400kV Wobulenzi–Masaka–Ibadakuli–Shinyanga power interconnector. 🔹 Trade and Industrialisation: Strengthen market access, eliminate non-tariff barriers and promote local manufacturing and value addition.

How media reported it (11) ▾

Links and short excerpts only. A matched article is a machine match until a person confirms it; tone shown elsewhere is generic.