Skip to content
DiploTrack

Department for Energy Security and Net Zero, United Kingdom (GBR)

United Kingdom Press release: STATEMENT

2026-11-03 · data through unknown

EN · statement #11362 ·

Who
Department for Energy Security and Net Zero, United Kingdom · United Kingdom
Topic
No topic assigned
Event
No event linked

No claim toward a country was found in this statement.

Positions are machine-coded from the highlighted sentence. How claims are read and which are shown

These are crucial questions for STEP and future fusion power plants. It’s also a great example of the engineering skill and collaboration across UKAEA’s science and engineering teams. Giant 12-tonne box lowered into place for fusion upgrade The double beam box lift took place as part of wider MAST Upgrade engineering work, currently underway, including the installation of a new electron Bernstein wave (EBW) microwave heating system. …
Full original text (EN, 1,458 Characters) ▾

These are crucial questions for STEP and future fusion power plants. It’s also a great example of the engineering skill and collaboration across UKAEA’s science and engineering teams. Giant 12-tonne box lowered into place for fusion upgrade The double beam box lift took place as part of wider MAST Upgrade engineering work, currently underway, including the installation of a new electron Bernstein wave (EBW) microwave heating system. Other engineering upgrades underway include: the transfer and repurposing of power supply equipment from the Joint European Torus (JET) fabrication and installation of the beam line module, which will allow the neutral beam to be formed and injected into the plasma manufacture and assembly of a cryopump, shortly to be installed inside the double beam box vessel, which will control the pressure in the double beam box installation of the positive ion neutral injectors (PINIs) About the double beam box vessel The completed double beam box vessel, including its lid, will weigh around 15 tonnes, roughly equivalent to two and a half African elephants. It has a volume of 20 cubic metres, about the same as 130 bathtubs, and is made from 316L stainless steel, a grade widely used in offshore infrastructure and medical implants for its strength, durability and resistance to corrosion. The material also offers good vacuum compatibility, essential for the ultra-high vacuum conditions required inside the vessel.